1. 2008 - Pine County, Pennsylvania

  2. 2008 - Green Power Electric, U.S. Virgin Islands

  3. 2008 - Joggins, NS, CA

  4. 2007 - Maritime Demolition, NS, CA

  5. 2007 - DR Project, Dominican Republic

  6. 2007 - Castle Douglas, Scotland

  7. 2005 - RCMP Station, NS, CA

  8. 2005 - New York, NY, US

  9. 2004 - Eskasoni , NS, CA

  10. 2003 - Sager Island, India

  11. 2003 - Kilrea, Ireland

  12. 2002 - Isle Luing, Scotland

  13. 2000 - Oreland Blueberry Farm, Maine, US

  14. 2000 - Rankin Inlet, Nunavut, CA

  15. 1999 - Sachs Harbour, NWT, CA

  16. 1998 - Blind River, Ontario, CA   

  17. 1998 - Carmichael Estates, Scotland                                 

Installation

The AOC 15/50 has been installed around the world. To date, projects have been completed in Canada, the United States, the Caribbean, Ireland, Scotland, Russia, and India. Remote community projects include Rankin Inlet (Nunavut), Sachs Harbour (Northwest Territories), Big Trout Lake (northern Ontario), Blind River (Ontario) and North Cape (PEI).

Once you order an AOC 15/50 and have all required electrical permits, utility approvals and zoning and other government approvals, the steps for installation include:

  Foundation
  • A geotechnical survey is conducted in order to design foundation suitable for each site.
  • The foundationis designed based on the geotechnical survey.
  • Local contractors install the concrete foundation to the specifications of the foundation design.

 

Electrical

  • A basic diagram and basic electrical components except for the wiring are provided and an electrician hooks up the wiring.
  • A tower is designed and built specifically for the wind conditions at your site
  • Typically, everything is assembled and then one lift of the crane raises the turbine

 

 

Benefits of the AOC 15/50.

The AOC 15/50 has proven reliability and durability combined with outstanding performance in remote climates. It has a simple design that requires minimal maintenance and it is flexible for off grid applications and net metering. Also, if you are in a remote area that requires an installation it has a tilt up tower that enables installations without the help of a crane.